1. Pune Metro Phase 2 expansion is gaining momentum with the announcement of bids for the design of 14 elevated metro stations.
  2. The bid invitation aligns with the central government’s efforts to accelerate metro development in Pune.
  3. The new stations will be constructed along the Kharadi-Khadakwasla and Nal Stop-Manik Baug corridors, improving connectivity in key areas.
  4. The appointed consultant will oversee the design of eight stations on the Kharadi-Khadakwasla corridor and six on the Nal Stop-Manik Baug corridor.
  5. Responsibilities of the consultant include detailed architectural and structural design of the metro stations, as well as incorporating energy-efficient technologies and eco-friendly construction materials.
  6. Maha-Metro is exploring commercial revenue opportunities through retail spaces, advertising panels, and kiosks within the metro stations.
  7. The Pune Metro Phase 2 project spans 31.64 km with an estimated cost of ₹9,897.19 crore, including 22 elevated stations on the Kharadi-Khadakwasla corridor and six on the Nal Stop-Manik Baug corridor.
  8. High-level discussions have been held in the national capital to fast-track approvals and secure funding for the project.
  9. Maha-Metro is collaborating with local authorities such as the Pune Municipal Corporation and Pune Metropolitan Region Development Authority for seamless integration and urban development planning.
  10. Design work for the new stations is expected to begin soon, paving the way for enhanced urban mobility in Pune.

Thanks For Reading Report of Punepress.com

Leave a comment

Your email address will not be published. Required fields are marked *