Hey there, did you notice a power outage in the Ganeshkhind area recently? Well, it turns out that to get the lights back on, they had to reroute power from the 220 kV substation. But here’s the kicker – the demand was so high that they had to do some fancy footwork with load management on other lines, leading to temporary power cuts on five 22 kV lines. Yikes!

Thankfully, after some technical tweaks and setting up alternative connections, power was fully restored. Phew! And get this – they’ve been working around the clock to fix the damaged line, with repairs expected to be finished by 5 PM. Talk about a race against time!

Looks like the power gods were on our side this time. Let’s hope everything stays smooth sailing from here on out.

Thanks For Reading Report of Punepress.com

Leave a comment

Your email address will not be published. Required fields are marked *