Hey there, folks! Today we’re talking about the latest news from PMRDA regarding the safety of buildings constructed under the PMAY project. Chief engineer Rinaj Pathan has emphasized the importance of getting these structures inspected by experts to ensure the safety of citizens. While the buildings appear stable, there are concerns about the quality of materials used during construction.

A whopping total of 45 buildings, each with 11 floors and one to two-bedroom flats, have been erected on a massive 52-hectare area. That’s a lot of living space! However, PMRDA isn’t taking any chances and has instructed developers to complete any necessary repair works by December 15 to address issues raised by residents.

Speaking of residents, they’ve reported problems with leakages, storage water tanks, and pipes in these buildings. It’s clear that action needs to be taken to address these issues and ensure the safety and comfort of those living in these flats.

Stay tuned for more updates on this story as it unfolds. Stay safe and take care, everyone!

Thanks For Reading Report of Punepress.com

Leave a comment

Your email address will not be published. Required fields are marked *