1. The Pune-Shirur Elevated Corridor project is set to bring relief to commuters along the Pune-Nagar highway by addressing traffic congestion in the Wagholi area. The project aims to provide a minimum of ten lanes to improve traffic flow.
  2. The project, which was originally under NHAI’s jurisdiction, faced a temporary pause in the tender process, leading to its transfer to MSIDC under state government supervision. This administrative shift is expected to expedite the project’s progress.
  3. MLA Dr. Amol Kolhe emphasized the importance of the elevated corridor in easing traffic woes and expressed confidence in its prompt commencement once approved by the state assembly or cabinet. The project’s scope includes an eight-lane flyover with potential extensions for metro or light rail.
  4. Despite the transfer to MSIDC, the project’s DPR remains unchanged, ensuring continuity in its planned phases. The pending cabinet approval is the final hurdle before the project can move forward under Maharashtra government directives.
  5. The phased implementation strategy of the Pune-Shirur Elevated Corridor underscores its significance in enhancing regional infrastructure and addressing longstanding traffic bottlenecks. Once approved, the project is expected to bring much-needed relief to commuters in the area.

Thanks For Reading Report of Punepress.com

Leave a comment

Your email address will not be published. Required fields are marked *